Production capacity planning guides
Practical guides on production capacity planning, written from the shop floor: formulas, worked examples and the decisions a plant makes every week.
Formulas · worked example
How to calculate production capacity per line and week
Available time, OEE, cycle time, required shifts and utilization, and how many lines a plant needs per year.
Backlog recoveryHow to build a backlog recovery plan for a factory
Measure backlog in shifts, rank recovery levers, set the order and its cost, and build tomorrow's load.
ToolsCapacity planning in Excel vs software: when to switch
When a spreadsheet is enough, the signs you have outgrown it, and what to look for in software.
RomânăCalculul capacității de producție pe linie și săptămână
Formule, exemplu și calculul liniilor necesare pe ani, în limba română.